Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2023-09-25 10:41
70
Company Profile
Zhejiang Onesto Electric Co.,Ltd.By certification [File Integrity]
Contact:onesto(Mr.)
Email:
Telephone:
Phone:
Area:Beijing
Address:Beijing
Website:http://www.onestoenergy.com/ http://onesto.yl-ltd.com/
Introduction
The solar industry has grown significantly in recent years, and large-scale adoption of renewable energy has become a trend. Many countries are adopting solar energy as an alternative power source and the demand for solar inverters is growing steadily. Our 2~3.6kw Single Phase On Grid Solar Inverter is an excellent solution for residential, commercial, and industrial solar systems. It converts the DC power generated by the PV strings into AC power and feeds the power into the grid, and is mainly used in residential applications to meet household needs for reliable and sustainable power generation. It is ideal for small to medium solar systems and requires very low installation and maintenance complexity.
High efficiency
Our 2~3.6kw Single Phase On Grid Solar Inverter adopts a single MPPT input and only receives input from a string of solar panels, ensuring that the inverter can work efficiently even when the temperature or solar radiation is below the ideal level, realizing the High peak efficiency of 98.6%. This design significantly reduces the energy loss of the system and increases the potential power output of the solar system. At the same time, according to market demand, its maximum input current has been updated to 15A.
High reliability
Its shell is made of aluminum alloy and other materials, which have reached the protection level of IP65, and the anti-corrosion level has reached C5, so it is suitable for changing outdoor environments and has a long service life. It is compatible with wide grid voltage, high harmonic grid environment, and high-power modules, so it has a wider range of applications.
Smart system:
2~3.6kw Single Phase On Grid Solar Inverter has an intelligent control system, which can monitor the system current, voltage, temperature, etc., and automatically adjust the conversion power to achieve the best power generation efficiency. You can use remote monitoring to troubleshoot and implement functions such as configuration updates and parameter adjustments, which is very convenient. The user-friendly interface requires minimal maintenance and saves more costs.
Detail Show
Product Specification
Model |
OST 2KTL-S15 |
OST 3KTL-S15 |
OST 3K6TL-S15 |
Efficiency | |||
Max. Efï¬ciency |
97.5% |
97.8% |
97.8% |
European Efï¬ciency |
96.5% |
96.8% |
96.8% |
Max. Input Voltage |
500V |
||
Max. PV conï¬guration (STC) |
150% |
||
Rated Input Voltage |
360V |
||
Max. Input Current |
15A |
||
Max.Short Circuit Current |
20A |
||
Start Input Voltage |
70V |
||
MPPT Operating Voltage Range |
50V-490V |
||
Max. Number of PV Strings |
1 |
||
No. of MPPTs |
1 |
||
Rated AC Active Power |
2,000W |
3,000W |
3,600W |
Max. AC Apparent Power |
2,200VA |
3,300VA |
3,600VA |
Max. AC Active Power (PF=1) |
2,200W |
3,300W |
3,600W |
Max. AC Output Current |
10A |
15A |
16A |
Rated AC Voltage |
220V/230V, L+N+PE |
||
AC Voltage Range â‘ |
160V-300V (Adjustable) |
||
DC Current Injection |
<0.5%ln |
||
Power Factor |
>0.99 Rated power (Adjustable 0.8 LD-0.8 LG) |
||
Topology |
Transformerless |
||
IP Rating |
IP65 |
||
Night Self Consumption |
<1W |
||
Cooling |
Natural cooling ℃ ℃ |
||
Operating Temperature Range |
-25 -60 |
||
Relative Humidity Range |
0-100% |
||
Max. Operating Altitude |
4000m |
||
Noise (typical) |
30dB |
||
Dimensions (W*H*D) |
320mm*344mm*137mm |
||
Weight |
6.5Kg |
||
Display |
Wireless & APP+LED, LCD (Optional) |
||
Communication |
Optional: WiFi / GPRS / RS485 |
||
Safety |
IEC62109-1/2 |
||
Grid Code |
IEC 61000-1/2/3/4, IEC 61727/62116, CEI 021 |
||
Warranty |
5 Years |
FAQ
Q:When I can receive quotation and detail information after sending the enquiry?
A:Within 24 hours.
Q:How long is the warranty?
A:Normally it is 5 years.
Q: What’s the warranty term?
A:Normally 5 Years
Q:What’s the lead time?
A:Normally it takes around 6 weeks after order confirmation.
Q:What’s the payment term?
A:30% TT in advance, balance against copy of B/L, or L/C at sight.
Q:Can you help me to select suitable products?
A:Sure, please send us inquiry and tell us your demand, we will have professional team to support you in model selection.
http://www.onestoenergy.com/